Thursday, October 23, 2008

Footings being poured


Today they are beginning to pour the footings. Excavation continues on the back side of the lot.

Tuesday, October 21, 2008

Excavation Continues

Excavation continues through the end of the this week. Next week they begin the footings and pouring the foundation.

Thursday, October 9, 2008

The Night the Library went Batty

Ken and Barb Bowman of the Bat Conservation of Wisconsin presented a fascinating program on the Bats of Wisconsin last night. Ken and Barb talked about the 11 species of bats that live in Wisconsin, what they eat, how they live, and what to look for in a bat house.

Special thanks to the Lakes Gallery of Fine Art for allowing us to hold this library program in the gallery.

Wednesday, October 8, 2008

Shoring Continues


The work on shoring up the east side of the library lot is continuing. Next on the schedule is completing the excavation of the basement, working on the footings, and then forming and pouring the basement walls.

Friday, October 3, 2008

Construction Resumes!


Construction has resumed on our library addition. Currently workers are shoring up the east side of the lot. 8 beams have to be drilled into the ground and then sheets of metal are placed between the beams to hold the soil back. After the shoring is complete, then excavation can resume.