Monday, December 15, 2008
Above Ground Walls are Going up
Labels:
backfill,
ICF,
insluated concrete forms,
spancrete,
waterproofing
Monday, November 17, 2008
Beams are going up.
Friday, November 14, 2008
Basement Walls are Poured.
Next week, they will be setting the steel for the columns, working on the under-floor electrical, and the piping for the HVAC (the library will have radiant heat). Then the basement floor will be poured.
Monday, November 3, 2008
Footings are complete. Next are the concrete forms.
Thursday, October 23, 2008
Tuesday, October 21, 2008
Excavation Continues
Thursday, October 9, 2008
The Night the Library went Batty
Ken and Barb Bowman of the Bat Conservation of Wisconsin presented a fascina
ting program on the Bats of Wisconsin last night. Ken and Barb talked about the 11 species of bats that live in Wisconsin, what they eat, how they live, and what to look for in a bat house.
Special thanks to the Lakes Gallery of Fine Art for allowing us to hold this library program in the gallery.
Special thanks to the Lakes Gallery of Fine Art for allowing us to hold this library program in the gallery.
Wednesday, October 8, 2008
Shoring Continues
Friday, October 3, 2008
Construction Resumes!
Construction has resumed on our library addition. Currently workers are shoring up the east side of the lot. 8 beams have to be drilled into the ground and then sheets of metal are placed between the beams to hold the soil back. After the shoring is complete, then excavation can resume.
Labels:
library additions,
library construction,
shoring,
wisconsin